The proposed scheme is unique and ground breaking, the first Micro Hydro power installation to use a 1000 metre pipe to increase the head of water available at the turbine and achieve a substantial increase in power output.
The Angiddy valley, near Tintern, is ideally suited to such a scheme.
Beaufort Pond Dam